Thursday, March 19, 2009

Pre-Handover Inspection done - finally ...

Finally i have my pre-handover inspection done yesterday. After a few rescheduled, now all done..

The defect list is quite large however most of them are minor, only some paint job/re-patch required, a few holes/cracks need to be fixed, some scratched carpet (but only a very small areas), privacy lock on the wrong door, brick clean again…etc..

Major issue, well, the LINEN architraves is not straight, but they are going to re-do the whole LINEN for me anyway because it didn’t build as per contract, so no concern.. Only the kitchen pantry door is not level, not sure if it can be fixed, it is quite obvious, but at least it is no structural concern.. the main bedroom door is also having the same issue but less obvious, so i just let it go (i won’t even notice if Kevin not pointed to me)

Overall look ok, but yes, still need to wait for Kevin report which should be available on Monday, but as he said, nothing major except the door level problem..

SS is good, i am so glad that i have a new SS now… he is very patient and willing to work with me and Kevin.. especially you know that he is working overtime because me and Kevin are not available till 5pm.. so our inspection occured quite late. And i brought one of my friends there as well, because my husband is not available.. and my SS still ok, and even listen to her when she found something..

Now, SS advised that he will try to get everything fixed in 5 days, although i am not confident of that.. let's see, i don't mind to wait another week, i just want everything fixed and good..

I still need to organise my electrican to complete the rest TV/phone, then i can phone the bank ready for the final payment (the bank also need to do final inspection), hope everything is going to be ok.. fingercross

4 comments:

ZePlatypus said...

congrats!

Clageo said...

Thank You..

Not sure when they can complete the fix.. have been to the house in the last 2 days, nothing has been done since the inspection day.. argh...

brimbank_gardens said...

hi clageo. have they completed the fix. our PCI is just 4 working days ahead and still a lot of things missing such as door knobs, shower glass screens, mirrors, basins, paving, garage doors. not sure if they can complete all of these before PCI. good luck to us.

Clageo said...

I dont know when they can complete the fix, couldn't get hold of SS until yesterday and then realise that Kevin report did not reach him (I am sure i sent it through).. well he only recieved the report yesterday and he said if there something need to discuss, he will then call me, otherwise he will arrange for those items fix... so i am not sure if i can get a handover before Easter... argh